丰满少妇高潮一区二区,2016久久久,人妻 -- 69XX,婷婷五月天久久AV

Welcome to the official website of Zhucheng Zhaoyang Machinery Co., LTD.

Web site announcement
This website is the official website of Zhucheng Chaoyang Machinery Co., LTD. Please pay attention to slaughtering products and industry information
  TEL:(Manager Zhu)15650277057

Contact us


Chaoyang machinery Co. LTD

phone:(Manager Zhu)15650277057

tel:0536-6480866

fax:0536-6480866

email:zczhaoyang@126.com

url:m.xiaoxinpapa.com.cn

Address: Shunwang Street Development Zone, Zhucheng city, Shandong Province

Company News

Company News

Your Current Location : Home News Company News

Broiler slaughter and processing process

Source: Time:2015-08-22 16:44:03 views:

Before unloading, obtain the certificate of conformity issued by the animal epidemic prevention supervision organization at the place of origin, and observe the vehicle.

One、 Schematic diagram of broiler slaughtering and processing process
Hair chicken hanging → water bath anesthesia → assassination → bleeding → scalding → depilation → manual cleaning of small hairs → chicken hair water rushing into chicken hair collection room → claw cutting → hanging → opening → viscera removal → cutting head → carcass cleaning → precooling → carcass draining → viscera entering visceral processing room for treatment → carcass hanging → segmentation → sorting → sorting, weighing and packaging → loading → quick freezing → packing → refrigeration → sales
Two、 Slaughtering and processing technology of broiler
1. Chicken feed
(1) Before unloading, obtain the certificate of conformity issued by the animal epidemic prevention supervision organization at the place of origin, and observe the vehicle. If no abnormality is found, the vehicle is allowed to unload after the certificate and goods are consistent.
(2) The chicken cages with feather chickens are removed from the transport vehicle and placed on the hanging platform. The quarantine personnel conduct on-site inspection. The chicken cages with qualified healthy feather chickens are placed on the chicken cage conveyor and transported to the hanging room on the feather chickens.
(3) The hair chicken hanging room and the slaughtering workshop shall be strictly separated. The hair chicken hanging room shall be designed as dark as possible to avoid strong light exposure, resulting in excessive tension when the hair chicken flapping its wings.
(4) The chicken hanging personnel took out the feather chicken from the chicken cage holding the chicken belly, and then hung the two chicken feet on the hanger of the production line. Each chicken hanging staff can hang 800-1000 chickens per hour.
(5) The returned chicken cages are automatically transported into the chicken cage cleaning machine by the conveyor for cleaning, and the cleaned chicken cages slide to the chicken unloading platform through the chicken cage ramp.
2. Slaughtering and depilation of Broilers
(1) The main processes completed by the broiler slaughtering elevated transmission line are: hanging the chicken, water bath type hemp electricity, assassination, bleeding, scalding, depilation, claw cutting, hanging, etc.
(2) The overhead transmission line rack spacing: 6 inches (152.4mm), using standard drive chain, chain pitch t=25.4mm, variable frequency speed regulation, the design killing capacity of the production line is closely related to the linear speed of the production line, and the calculation formula of linear speed: linear speed = hourly output (only / hour) × Pylon spacing (m) ÷ 60 (min / h)
For example: design capacity: 3000 PCS / h, pylon spacing: 152.4mm
Line speed of production line: 3000 PCS / h × 0.1524 m ÷ 60 min / h =7.62 M / min.
(3) Water bath type anesthesia is usually used for live chickens. The anesthesia voltage is 70-90v and the anesthesia time is 2-3s. Or not through the hemp electricity process, the chicken is automatically transported for 1min through the overhead transmission line after hanging, so that the chicken can be stabbed after calming down.
(4) The bleeding time of the feather chicken after assassination is generally designed to be 3-4min. Scalding time: 40-60s, depilation time: 15-30s.
(5) Constant temperature ironing machine is used for ironing, and the ironing temperature is 58-62 ℃. Hang type depilation shall be adopted as far as possible to avoid infection caused by carcass contact.
(6) At 90. An automatic claw cutting machine is designed at the turning of the. The claw cutting machine is composed of a locating wheel, a drive and a rotating blade. After the chicken claw is cut, the chicken claw is unloaded by the claw unloader and placed in the collection vehicle.
3. To cut open the viscera
(1) The main processes completed by the broiler gut opening and evisceration elevated conveyor line include: gut opening, evisceration, head cutting, carcass cleaning, etc.
(2) The hook spacing of the overhead conveyor line: 8 inches (203.2mm), using standard drive chain, chain pitch t=25.4mm, variable frequency speed regulation.
(3) Put the extracted viscera into the visceral chute for inspection by the quarantine personnel. The qualified chicken carcass will enter the next process, the qualified chicken viscera will enter the visceral processing room for treatment, and the unqualified carcass and viscera will be put into a closed car and pulled out of the slaughtering workshop for treatment.
(4) The internal organs are separated. The chicken intestines are cleaned and sorted out and then put into the cold storage for cold storage. The chicken gizzards use the chicken gizzard degreasing machine to remove the grease on the surface of the chicken gizzards, and then the gizzard skin is peeled off by the gizzard peeling machine. After cleaning and sorting, the chicken intestines are put into the cold storage for cold storage.
(5) Eviscerate, the carcass must be cleaned before precooling to remove blood and water from the body.
4. Precooling
(1) Precooling is divided into pool precooling and spiral precooling. The area occupied by pool precooling is larger than that of precooling by precooling machine.
(2) Precooling water temperature: 0-2 ℃, precooling time: 45min.
(3) The pre cooled carcass shall be drained by a dryer or an overhead conveyor line.
(4) The central temperature of pre cooled chicken carcass was below 10 ℃.
5. Split packaging
(1) The distance between hooks for dividing the overhead conveyor line: 8 inches (203.2mm), using standard drive chain, chain pitch t=25.4mm, variable frequency speed regulation.
(2) On the elevated conveying line, there are segmentation operators to segment the meat at different parts, and the segmented meat is transferred to the sorting station on the flat conveyor for sorting.
(3) Weigh the sorted meat and vacuum pack it according to the requirements, put it into the freezing tray, and use the cold meat trolley to push it to the freezing warehouse (-30 ℃) for freezing or to the finished product cooling room (0-4 ℃) for fresh preservation.
(4) Pack the frozen product pallets and store them in the refrigerator (-18 ℃).
(5) Temperature control of split packaging room: 10-15 ℃.

keys: 
Home   |  About us   |  News   |  Products   |  Case   |  Video   |  Contact Us   |  易站通  | Management 

Copyright © all rights reserved◎Zhaoyang Machinery Co., Ltd. 
Tel:0536-6480866     Fax:0536-6480866      Contact person: (Manager Zhu) 15650277057

Address: King Street Development Zone, Zhucheng City in Shandong Province       Technical support: Hengtai interconnection

Website record number: Shandong ICP preparation of 14004351 -8 

国产成人免费一区二区三区| 神马久久影院| 懂色aⅴ国产一区二区三区| 日韩欧美视频在线观看中文字幕| 免费网站在线观看亚洲| 国产精品午夜99| 777奇米成人狠狠成人影视| 精品丁香影视| 亚洲五月婷婷综合激情| 一本之道之高码清乱码加勒比| 日韩无码30p| 黑人一区二区不卡| 国产精品极品美女自免费| 91热国产精品| 亚洲成人玖玖玖玖| 一道本久久宗合久久| 亚洲愉拍一区二区三区| 亚洲无码日逼AV| 真人毛片一级视频| 免费成人精品日韩Sb| 少妇人妻偷人AV高清| 久久久国产精品三级片| 亚洲精品中文久久蜜| 亚洲精品色婷婷久久| 精品中文字幕一级久久免费| 六月婷婷乱伦| 热99.re久久这里全是精品| 人妻高清无码| 婷婷五月天不卡| 成人爽s毛片在线视频| 日韩高清无线码成人久久| 日韩欧美一个黄片| 亚洲av综合色区无码一区| 久久久久蜜桃精品成人片| 婷婷视频色| 最新AⅤ| 在线看片人成视频免费无遮挡| 四虎影视8848hh| 中文亚洲爆乳av无码专区| 久久艹一区二区| 国产偷国产偷亚州清高APP|